https://newsletter.en.creamermedia.com
Africa|Automotive|Coal|Construction|Energy|Eskom|Infrastructure|Roads|Infrastructure
Africa|Automotive|Coal|Construction|Energy|Eskom|Infrastructure|Roads|Infrastructure
africa|automotive|coal|construction|energy|eskom|infrastructure|roads|infrastructure

Zero Carbon Charge, AIDC-EC launch off-grid EV charger programme in the Eastern Cape

8th October 2024

By: Irma Venter

Creamer Media Senior Deputy Editor

     

Font size: - +

Zero Carbon Charge (Charge), in partnership with the Automotive Industry Development Centre Eastern Cape (AIDC-EC), and together with the Eastern Cape provincial government, has broken ground on what it describes as an off-grid, ultra-fast, green electric vehicle (EV) charging network.

Once completed, the network in the Eastern Cape should consist of 29 sites, 18 of which will be dedicated to electric passenger and light commercial vehicles (LCVs), while 11 will be off-grid electric truck charging stations.

The charging stations will be located along the N10, N6, R56, N9 and N2.

Charge says both charging networks will operate independently of Eskom’s predominantly coal-powered grid, which means they should be green and loadshedding-proof.

It is envisaged that construction of the first charging station at Wagon Wheels Farm Stall on the N6 will start in the first quarter of next year.

Charge believes the demand for this type of charging infrastructure is only set to grow.

Following the latest predictions by motor and energy industries stakeholders, there will be around 120 000 electric vehicles on South Africa’s roads by 2027, and 360 000 by 2030.

“We are grateful for the support from the Eastern Cape provincial government in streamlining current application processes, which has allowed us to start breaking ground on the 29 planned charging stations across the province,” says Charge chairperson Joubert Roux.

“Transformation to a low-carbon economy is not only about climate change, but also about ensuring the province remains economically competitive, whilst maintaining the principles of Just Transition,” adds AIDC-EC CEO Thabo Shenxane.

Charge says landowners hosting the charging stations will earn 5% of the revenue generated by the vehicles making use of these facilities.

 

 

Edited by Creamer Media Reporter

Comments

Showroom

John Thompson
John Thompson

John Thompson, the leader in energy and environmental solutions through value engineering and innovation, provides the following: design, engineer,...

VISIT SHOWROOM 
WearCheck
WearCheck

Leading condition monitoring specialists, WearCheck, help boost machinery lifespan and reduce catastrophic component failure through the scientific...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (11/10/2024)
11th October 2024 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.068 0.169s - 194pq - 2rq
Subscribe Now