https://newsletter.en.creamermedia.com
Design|rail|Road|Roads|transport|Environmental|Infrastructure
Design|rail|Road|Roads|transport|Environmental|Infrastructure
design|rail|road|roads|transport|environmental|infrastructure

Gauteng govt seeks input on proposed Gautrain extension

12th July 2021

By: Simone Liedtke

Creamer Media Social Media Editor & Senior Writer

     

Font size: - +

Gauteng Public Transport and Roads Infrastructure MEC Jacob Mamabolo has confirmed that his department intends to determine a route for Phase 1 of the Gautrain Rapid Rail Integrated Network extensions in terms of the province’s Transport Infrastructure Act.

The proposed route starts at the Little Falls Station, on Hendrik Potgieter road in Willowbrook. From there, the route runs in a north-easterly direction towards Zandspruit, where the route will pass to the west of the Jackal Creek Golf Estate.

The route then changes in a south-easterly direction towards Cosmo City and a newly proposed Cosmo station, from where the route will continue in a south-easterly direction towards the newly proposed Randburg station – passing through North Riding, Olivedale, Bryanston and Ferndale.

The route will then continue in a south-easterly direction through Randburg, Bordeaux and Hurlingham. Once it has reached Sandhurst, the route will change direction towards the existing Sandton station, where an upgraded station is proposed.

From Sandton, the route will run in a north-easterly direction through Sandton, Sandown, Marlboro and Alexandra towards the existing Marlboro station, which will be upgraded to accommodate the new alignment.

A preliminary route alignment report, and environmental assessment report, for the proposed alignment are available for inspection on the Gautrain Management Agency’s (GMA's) website.

The information contained in the preliminary route alignment report is only to the extent required for purposes of route determination and contains a broad description of the route only.

Further information on detailed design, road closures and the impact on properties located along the proposed alignment will be developed as part of the preliminary design phase that is required by Section 8 of the Act and is undertaken as part of the next planning phase.

Written comments from interested and affected parties on the proposed extension can be submitted on the GMA’s website, or by email to phase1@gautrainrapidrail.co.za, by August 15.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

 

Showroom

Schauenburg SmartMine IoT
Schauenburg SmartMine IoT

SmartMine IoT has been developed with the mining industry in mind, to provides our customers with powerful business intelligence and data modelling...

VISIT SHOWROOM 
GreaseMax
GreaseMax

GreaseMax is a chemically operated automatic lubricator.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 13 December 2024
Magazine round up | 13 December 2024
13th December 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.235 0.326s - 195pq - 2rq
Subscribe Now