https://newsletter.en.creamermedia.com
Gold|Power|PROJECT|Slurry|Solar|Bearing
Gold|Power|PROJECT|Slurry|Solar|Bearing
gold|power|project|slurry|solar|bearing

GREENER GOLD

GREENER GOLD: DRDGOLD’s R2.8-billion Tshedza hybrid electricity project in Ekurhuleni, comprising over 133 000 solar panels and 43 batteries, is providing the Ergo gold tailings retreatment operation with decarbonised, reliable and cost effective power. The Ergo plant requires stable electricity to treat gold-bearing slurry that comes into the Brakpan facility from as far afield as Soccer City, some 50 km away. Photograph: Creamer Media Chief Photographer Donna Slater

Photo by Creamer Media Chief Photographer Donna Slater

22nd November 2024

     

Font size: - +

DRDGOLD’s R2.8-billion Tshedza hybrid electricity project in Ekurhuleni, comprising over 133 000 solar panels and 43 batteries, is providing the Ergo gold tailings retreatment operation with decarbonised, reliable and cost effective power. The Ergo plant requires stable electricity to treat gold-bearing slurry that comes into the Brakpan facility from as far afield as Soccer City, some 50 km away. Photograph: Creamer Media Chief Photographer Donna Slater

Edited by Creamer Media Reporter

Comments

Showroom

Hanna Instruments (Pty) Ltd
Hanna Instruments (Pty) Ltd

We supply customers with practical affordable solutions for their testing needs. Our products include benchtop, portable, in-line process control...

VISIT SHOWROOM 
Neoflex Safety Boot
BOVA Safety Wear

BOVA cemented their reputation in Africa by delivering high quality engineering through their range of safety footwear. 21 years after producing...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:1.311 1.402s - 168pq - 2rq
Subscribe Now