https://newsletter.en.creamermedia.com

Scatec brings second phase of Mmadinare Solar Cluster in Botswana online

10th December 2025

By: Darren Parker

Deputy Editor Online

     

Font size: - +

Renewable-energy provider Scatec has started commercial operation of the second 60 MW phase of the 120 MW Mmadinare Solar Cluster in Botswana, completing the country’s first utility-scale solar PV facility.

The first phase of the project has been operational since March this year.

The solar power plant will generate revenues under a 25-year power purchase agreement (PPA) with the national utility Botswana Power Corporation. Scatec owns 100% of the project portfolio but expects to reduce its long-term economic interest by inviting additional equity partners.

“We are very proud to achieve commercial operation date for the second phase of the solar power plant portfolio within budget and ahead of schedule, reinforcing our commitment to advancing renewable energy in the region.

“This is an important first step for Botswana that holds significant potential for deployment of competitive and reliable renewable energy to support economic development,” Scatec CEO Terje Pilskog said on December 10.

“As Botswana accelerates its renewable-energy transition, this milestone represents an important moment for the country and region. Solar power is increasingly central to powering communities and driving sustainable growth.

“We are honoured to operate the country’s first utility-scale solar PV facility and contribute to Botswana’s long-term energy ambitions,” Scatec executive VP and GM for sub-Saharan Africa Alberto Gambacorta added.

Together, the two phases of the Mmadinare Solar Cluster are expected to generate 280 GWh/y of clean energy, which will contribute to an estimated reduction of 380 000 t/y of CO2 emissions.

Scatec will provide operation, maintenance and asset management services for both power plants.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Comments

Showroom

Trotech
Trotech

Design, Construction and Maintenance of Site Erected, Welded Bulk Storage Tanks for the Petrochemical, LNG, Ammonia and Sustainable fuel Sectors.

VISIT SHOWROOM 
Egoli Gas (Pty) Ltd
Egoli Gas (Pty) Ltd

As a reticulator, Egoli Gas provides natural gas to homes and businesses via underground pipes.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Afromix MD Eugene Els speaks to Martin Creamer on Video
Afromix MD Eugene Els speaks to Martin Creamer on Video
8th December 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.169 0.259s - 165pq - 2rq
Subscribe Now