Small modular nuclear pilot plant, Finland
Photo by Steady Energy
Name of the Project
Small modular nuclear (SMR) pilot plant.
Location
The pilot plant, comparable in size to an upright shipping container, can be built entirely underground or on an existing industrial site. Proposed locations include the Salmisaari caves, in Helsinki; the Huuhanmäki caves, in Kuopio; and the power plant sites at Kymijärvi and Teivaanmäki in Lahti, all in Finland.
Project Owner/s
Steady Energy.
Project Description
The project will result in the construction of Finland’s first SMR pilot plant.
The pilot will serve as a full-scale, operational model of the Finnish-designed SMR unit. Unlike the actual power plant, the pilot unit will use an electric element to produce heat inside the reactor capsule instead of nuclear fuel. The main purpose is to test operational features and establish the necessary supply chains with various manufacturers to build actual plants.
Potential Job Creation
Not stated.
Capital Expenditure
About €15-million to €20-million.
Planned Start/End Date
The construction of the first operational plant is projected to start by 2028, with the first unit expected to be operational by 2030.
Latest Developments
Final evaluations of potential sites are under way, with a decision expected in the second half of 2024. Thereafter, detailed planning and tendering for construction will start.
Key Contracts, Suppliers and Consultants
None stated.
Contact Details for Project Information
Steady Energy, tel +358 40 707 6637 or email info@steadyenergy.com.
Comments
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation