https://newsletter.en.creamermedia.com

Receive our free daily newsletter:

WEIR

Press Office - WEIR

Image of a Weba transfer chute
Chute systems help solve inefficient material transfer challenges
6th February 2026

Process flow challenges impact plant performance in the mining industry and typically arise when new or existing screens, crushers or feeders underperform as a result of inefficient material... 


Image of SM55 surface miner from Vermeer
New compact surface miner now available
6th February 2026

A compact, transportable surface miner designed to deliver production-level performance on a range of jobs, such as continuous surface mining in quarries and mines as well as civil construction... 


Image of a Sandvik Rock Processing screen
Expanded support for West Africa’s crushing and screening needs
6th February 2026

Sandvik Rock Processing says it is extending its footprint in West Africa in an effort to support the region’s growing mining sector with service offerings that include on-site engineering, parts... 


Image of Metso HRC 8 high pressure grinding roll, distributed by Pilot Crushtec
High pressure grinding roll transforms unsaleable materials
6th February 2026

A high pressure grinding roll (HPGR) designed to deliver crushing efficiency, shape and gradation in demanding sand and aggregate applications is now available from Pilot Crushtec. The Metso HRC 8... 


A stack of gold bars
Bendigo-Ophir gold project, New Zealand – update
6th February 2026 By: Sheila Barradas

Santana Minerals has secured access over council roading assets necessary to allow for tBendigo-Ophir to proceed, subject to receipt of Fast-track Approvals Act consent. 


Aerial view of the Skouries gold project
Skouries gold/copper project, Greece – update
30th January 2026 By: Sheila Barradas

Eldorado Gold has initiated its first dividend programme. 


Pilot Crushtec powers Africa’s mining evolution
Pilot Crushtec powers Africa’s mining evolution
30th January 2026

For more than 35 years, crushing and screening solutions provider Pilot Crushtec International has been a driving force in mining productivity, delivering world class crushing and screening... 


Sandvik Rock
Sandvik is shaping the future of rock processing
30th January 2026

Rock processing solutions provider Sandvik has long been recognised as a global leader in engineering solutions for the mining and infrastructure sectors. Within the group, the rock processing... 


Metso’s HRC 8 high pressure grinding roll, available from Pilot Crushtec, is engineered to transform difficult feed into high quality manufactured sand
HRC™ 8 is turning waste into high-value sand
26th January 2026

With demand rising for high quality manufactured sand and pressure mounting to reduce unsaleable materials  and environmental impact, Metso’s HRC™ 8 high pressure grinding roll (HPGR) is proving to... 


Skouries is nearing its transition into production.
Eldorado launches dividend as confidence grows in Greece portfolio
23rd January 2026 By: Mariaan Webb

Midtier gold producer Eldorado Gold has initiated its first dividend programme, citing its strong financial position and growing confidence in the delivery of its major growth projects in Greece,... 


Image of gold pellets
Buckreef gold project expansion, Tanzania
23rd January 2026 By: Sheila Barradas

TRX Gold Corporation proposes to expand and upgrade the existing process plant at Buckreef and a transition from openpit mining to underground mining. 


Location map of the Berg project, in Canada
Berg gold project, Canada – update
23rd January 2026 By: Sheila Barradas

Surge Copper has completed its 2025 multidisciplinary drilling and field programme at the Berg copper project, marking an important step towards a prefeasibility study. 


Location map of the Koné project
Koné gold project, Côte d'Ivoire – update
23rd January 2026 By: Sheila Barradas

Montage Gold is making rapid construction progress. 


Two images of graded and sized aggregrates
Ensuring quality aggregates for reliable construction 
22nd January 2026

In the construction sector the correct sizing and grading of aggregates can determine the strength, durability and long-term performance of a structure, with poorly graded aggregates potentially... 


Iamgold meets 2025 production guidance, sets outlook for 2026
19th January 2026 By: Mariaan Webb

Toronto-listed Iamgold has reported preliminary attributable gold production of 765 900 oz for 2025, achieving the midpoint of its full-year guidance following record quarterly output across all... 


Sandvik Rock Processing screens are backed by extensive in-country expertise in West Africa, ensuring reliable support and optimal performance throughout their entire operational lifecycle
Sandvik Rock Processing deepens support across West Africa
19th January 2026

West Africa has long established itself as one of the continent’s most exciting regions for exploration and mining, and Sandvik Rock Processing continues to build on its strong footprint of... 


A custom Weba Chute streamlines material flow from conveyor to stockpile at a platinum mine, precisely managing the material trajectory to eliminate spillage and uncontrolled impact at the start of the circuit
WEBA Chute Systems solves the hidden bottlenecks behind plant underperformance
19th January 2026

Across the mining industry, a notable trend has emerged where original equipment manufacturers (OEMs), engineering, procurement and construction management (EPCM) contractors and mine operators are... 


Image of Barroso drill core
Barroso lithium project, Portugal – update
16th January 2026 By: Sheila Barradas

Savannah Resources has been awarded a nonreimbursable grant of up to about €110-million to support construction of the Barroso project. 


Location map of the Berg gold project, in Canada
Berg gold project, Canada – update
16th January 2026 By: Sheila Barradas

Surge Copper Corp has completed its 2025 multidisciplinary drilling and field programme, in a key step towards a prefeasibility study planned for the first half of this year. 


Image of Karlawinda mine headgear
Karlawinda gold project expansion, Australia – update
16th January 2026 By: Sheila Barradas

Capricorn Metals has delivered a strong quarter of operations for the quarter ended December 31, 2025. 


Chunk of graphite
Kookaburra graphite project, Australia – update
16th January 2026 By: Sheila Barradas

Lincoln Minerals has signed a collaboration agreement with Canada-based SCN Canada to jointly investigate the use of graphite from Lincoln's Kookaburra graphite project in small modular nuclear... 


Aerial view of the NAL operation
North American Lithium expansion project, Canada – update
16th January 2026 By: Sheila Barradas

Elevra Lithium has identified a revised, staged development pathway for the expansion of the operation. 


Image of Cuba flag and periodic table symbols for gold and copper
Nueva Sabana gold/copper openpit mine – Stage 1, Cuba – update
16th January 2026 By: Sheila Barradas

Early site works are under way. 


Image of US flag and periodic table symbols for gold and silver
DeLamar heap-leach gold project, US – update
16th January 2026 By: Sheila Barradas

Integra Resources has secured a defined and accelerated federal permitting schedule, reducing regulatory uncertainty and supporting progress towards a construction-ready profile. 


Processing infrastructure at the Shafter project
Black Bear assesses restart of Texas silver project
15th January 2026 By: Mariaan Webb

ASX-listed Black Bear Minerals has engaged global engineering and project delivery firm Ausenco to undertake an operational restart assessment at its Shafter silver project in Texas, as it... 


Amit Dawneerangen, Construction Materials Executive: Sales & Product Technical at Afrisam
Quality aggregates are the foundation of strong, durable construction
13th January 2026

In the world of construction, the quality of materials directly determines the strength, durability and long term performance of any structure. Among these materials, aggregates - whether used in... 


Elevra identifies staged pathway to accelerate NAL expansion
Elevra identifies staged pathway to accelerate NAL expansion
12th January 2026 By: Mariaan Webb

Australia-listed Elevra Lithium Limited has identified a revised, staged development pathway for the expansion of its North American Lithium (NAL) operation that is expected to bring forward... 


Image of gold beads
Black Pine oxide gold project, US – update
9th January 2026 By: Sheila Barradas

Liberty Gold has reached a major permitting milestone for the project. 


Kiniero project drill rig
Kiniéro gold project, Guinea – update
9th January 2026 By: Sheila Barradas

First ore has been delivered to the mill ahead of first gold production. 


Andrada CEO Anthony Viljoen
Andrada reports solid quarter amid favourable price environment
17th December 2025 By: Sabrina Jardim

Aim-listed Andrada Mining has reported that its Uis mine, in Namibia, continued to deliver operational improvements during the third quarter ended November 30, benefitting from higher throughput,... 


Improving asset performance for more resilient mining operations
12th December 2025

In today’s African mining sector, reliability has become a daily challenge rather than a maintenance metric. Teams work in environments where equipment rarely gets a break, conditions shift without... 


Pirquitas crushed ore stockpile
Puna Operations, Argentina
12th December 2025 By: Sheila Barradas

A silver, lead and zinc in the Puna region of north-western Argentina. 


Rainbow Rare Earths senior metallurgist Roux Wildenboer interviewed by Mining Weekly's Martin Creamer.
South Africa’s low-cost, high-value rare earths heading for global market entry
10th December 2025 By: Martin Creamer

Mining Weekly has just visited the laboratories that Rainbow Rare Earths has established very innovatively on the north-western fringe of Greater Johannesburg as part of its journey towards... 


A Weba Chute Systems field advisor inspects a conveyor transfer point in operation, underpinning the company’s ongoing commitment to ensuring optimal material flow and performance across all installations
Weba Chute Systems delivers decade-long performance at Palabora Copper Mine
8th December 2025

More than a decade after installation, the custom engineered transfer chutes supplied by Weba Chute Systems to Palabora Copper Mine (PMC) continue to operate with virtually no maintenance - a... 


MinRes breaks ground at Lamb Creek iron-ore project
MinRes breaks ground at Lamb Creek iron-ore project
8th December 2025 By: Creamer Media Reporter

Diversified resources company Mineral Resources (MinRes) has officially broken ground at its Lamb Creek iron-ore project in the Pilbara after securing all required regulatory approvals. Lamb Creek... 


Image of gold bar/nuggets
Cripple Creek & Victor mine, US
5th December 2025 By: Sheila Barradas

A gold mine in Denver, Colorado, in the US.  


Aerial view of the Karowe mine
Karowe underground expansion project, Botswana – update
5th December 2025 By: Sheila Barradas

Lucara Diamond Corporation has awarded a lateral development contract to Group R Mining and Exploration Botswana. 


Image of phosphate stockpiles
Cabinda phosphate project, Angola – update
5th December 2025 By: Sheila Barradas

Minbos Resources has announced a shift in its development strategy. 


An image of the Steenkampskraal Monazite Mine
Rare earths project leverages demand for longevity
5th December 2025 By: Nadine Ramdass

Through its rare earths Steenkampskraal project, in Western Cape, rare earths miner Steenkampskraal Monazite Mine (SMM) aims to progressively increase local beneficiation, skills development and... 


Metso TankCell TC e300
Harmony awards Metso key equipment contract for its Eva copper project
4th December 2025 By: Sabrina Jardim

Process technology company Metso has reported that gold and copper producer Harmony Gold Mining Company has selected it to deliver the key equipment for its Eva copper project, in Queensland,... 


The bottom shell of the old crusher is being removed to make way for the installation of the new Sandvik CH865i cone crusher supplied by Sandvik Rock Processing
Sandvik CH865i unlocks major production gains at Ghana gold mine
3rd December 2025

Production at a gold mine in Ghana was recently ramped up with the help of the advanced Sandvik CH865i cone crusher, following close collaboration with the Sandvik Rock Processing team in Ghana to... 


Surface infrastructure at the Karowe mine
Lucara awards last major Karowe underground contract
2nd December 2025 By: Creamer Media Reporter

Canada-headquartered Lucara Diamond Corporation has awarded a lateral development contract for its Karowe underground project (UGP), in Botswana, to Group R Mining and Exploration Botswana. The... 


Image of The Sandvik UJ443E mobile crushing plant
First fully electric mobile crushing plant for Africa
28th November 2025

Sandvik Rock Processing, through distributor S&R Enterprises, has introduced its first fully electric mobile crushing plant in Africa with the sale of its UJ443E heavy jaw unit. Built on a fully... 


1
2 3

Showroom

AirNox Pty Ltd
AirNox Pty Ltd

AirNox (Pty) Ltd is a level 1 BBBEE manufacturer of complete AdBlue® solutions for operators of SCR diesel engines and AUS40 across South Africa...

VISIT SHOWROOM 
Monitor Distributors
Monitor Distributors

We at Hawk High Pressure Pumps specialise in industrial pumps and pumping systems. Our high pressure washing equipment is locally manufactured and...

VISIT SHOWROOM 
M and J Mining
M and J Mining

M and J Mining are leading suppliers of physical support systems as used by the underground mining industry. Our selection of products are not...

VISIT SHOWROOM 
SafeQuip
SafeQuip

SafeQuip is a leading distributor and manufacturer of fire safety solutions, offering a comprehensive range of products designed to meet all...

VISIT SHOWROOM 
Alco-Safe
Alco-Safe

Developed to exceed the latest EN 15964 standards for police breathalysers proving that it will remain accurate and reliable for many years to come.

VISIT SHOWROOM 
ECG Engineering
ECG Engineering

ECG provides specialised electrical engineering services to the Mining, Utilities, Materials Handling and Industrial industries, with extensive and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

TLT Turbo Africa launches SMART Fan for mining
TLT Turbo Africa launches SMART Fan for mining
4th February 2026

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







pqt: 1.057s - ct: 1.328s - 521pq - 2rq
Subscribe Now